Successful Collaboration on Superyacht Refit

As part of a recent superyacht refit at Zwijnenburg Shipyard. Newthex was commissioned to deliver both the design and control systems for several large hydraulically operated deck hatches.

Thanks to the combined expertise of both companies, the installation and commissioning were completed successfully on board. A strong example of collaboration within the Dutch maritime industry!